Safe System of Work Planning

SSOW planning — site-specific Safe Systems of Work for railway projects.

Bespoke Safe System of Work plans and safe work packs developed from the work, location, hazards and relevant railway information.

Discuss SSOW planning
Site-specificPlanning based on the actual location, activity and access arrangements.
Standards informedRelevant standards and infrastructure information brought together.
Delivery focusedControlled information prepared to support teams attending site.

Service scope

Bespoke safe work packs, not generic paperwork.

ROPS brings together the information needed to plan how site teams can access railway infrastructure and undertake the agreed activities safely.

01

Worksite review

Consideration of the planned activity, location, access points, surrounding infrastructure and known interfaces.

02

Relevant standards

Planning developed with reference to the applicable Safe System of Work hierarchy and agreed project requirements.

03

Infrastructure information

Relevant Sectional Appendix information, hazard records, signal diagrams and other site-specific sources.

04

Controlled pack

A clear, bespoke output that supports briefing, understanding and the agreed arrangements for site attendance.

Safe System of Work planning and SSOW documentation for railway projects — ROPS Liverpool

Typical information

Bring the location, activity and hazards together.

Effective SSOW planning depends on accurate, current and relevant information about both the work and the railway environment.

  • Work description and planned methodology
  • Site location, access points and limits
  • Possession, isolation and line blockage interfaces
  • Sectional Appendices and National Hazard Directory information
  • Signal diagrams and other relevant infrastructure records

Planning sequence

A controlled route to the safe work pack.

01

Gather

Collect the work, site, access and infrastructure information needed for planning.

02

Assess

Review the hazards, interfaces and applicable safe system arrangements.

03

Prepare

Develop the site-specific plan and supporting safe work pack information.

04

Issue

Provide the controlled output for review, briefing and agreed use.

Plan the worksite

Turn site information into a clear safe system.

Contact ROPS with the work scope, location and access details available. We develop SSOW plans and safe work packs for rail projects across England, Scotland and Wales.

Contact ROPS